Two methodologies are currently at the apex of the continuous improvement evolution: Six Sigma and Lean.
Six Sigma evolved directly from mainstream quality control methods.
In the 1970s, a Japanese company took over a Motorola plant that produced TV sets. Japanese corporate leaders changed the management and workflow, but they retained the workforce, technology, and designs. The factory was soon producing TV sets with 1/20 the number of defects. Motorola realized that in order to survive, it had to change.
In the mid-1980s, Motorola CEO Bob Galvin launched the initiative known as Six Sigma, which turned the company around. Six Sigma enabled Motorola to save $16 billion and win the Malcolm Baldrige National Quality Award in 1988.
Then, in 1995, Jack Welch converted General Electric into a Six Sigma operation with legendary results. After that, Six Sigma’s popularity really took off.
Six Sigma incorporates the work of many quality pioneers, as well as proven approaches and techniques that came before. Consider these Six Sigma characteristics:
- Emphasis on the DMAIC approach to solving problems. DMAIC is based on the PDCA improvement cycle.
- Rigorous application of statistics. Using statistical tools in all phases of DMAIC, specifically in the Analyze, Improve, and Control phases.
- Use of proven tools and techniques for defect reduction. Six Sigma uses statistical, strategic, financial, analytical, project management, and business tools to address process and quality-related issues.
- Use of well-trained, independent teams to handle well-defined projects. Use of independent teams and worker participation was pioneered by the Japanese with quality circles and the gemba.
- Reorganization to focus on processes and quality, rather than functional silos. Re-engineering, TQM, and ISO 9000 all advocate a process-oriented approach to organizing for quality.
In addition, Six Sigma is increasingly being used with the balanced scorecard. The balanced scorecard helps a company to determine its objectives and metrics. After the company determines what it wants to achieve, the business improvement strategy moves on to project selection. In this stage, a company decides which projects are viable or require urgent attention. Six Sigma then takes over to address performance gaps.
Lean came from a different evolutionary path than Six Sigma. Lean was formed in a Japanese manufacturing environment.
In 1949 at the Toyota Motor Company, Taiichi Ohno and Shigeo Shingo began to work with Henry Ford’s production techniques, as well as the statistical quality control practices of Ishikawa, Deming, and Juran, and the PDCA cycle as modified by Deming. Ohno and Shingo rolled their methods into the Toyota Production System.
The new system focused on removal of waste and reduction of inventory; it successfully reduced setups to minutes and seconds, allowing for small batches and an almost continuous flow of product.
In addition, Ohno and Shingo pioneered the use of participation management and independent, self-managed teams. Their work produced the quality circle movement and the gemba. “Gemba” means “shop floor,” and Toyota keeps a high percentage of its management on the gemba. Supervisors become aware of quality issues as they arise and resolve disputes promptly.
When news of Toyota’s success hit the outside world, American executives went to Japan to study Toyota’s methods.
By the 1980s, some American manufacturers were achieving success with elements of Toyota’s system. In 1990, James Womack coined the term “Lean manufacturing” to describe the combined techniques and methods of the Toyota Production System in his book “The Machine That Changed the World.”
By 2000, there was a body of experience and knowledge about Lean, and the methodology was in widespread use. Since Lean is also being applied in many non-manufacturing environments today, the word “manufacturing” has largely been dropped from the name.